The Impossible Site

Project Info

  • Category

    1

Location – Ursa Court Brighton

Client – Housing Association 

Project Duration – 28 Days

Substrate – Silicone Render

Access Method – Spectrum Steam Pole / Abseil Team.

Spectrum was approached by a Housing Association to renovate the external façade on a block of flats in the centre of Brighton. Ursa court is a five-story apartment block in Brighton, just off Lewes Road. The apartment block consists of 218. Due to its location both on the main road and only 1 mile from the oceanfront many years of traffic and environmental pollution had left this building in a very soiled state. Ursa Court had been branded an eyesore by the local council for years. The location of the site meant many of its elevations were deemed impossible to renovate without significant disruption. Ursa court’s location was one of the most challenging aspects of this restoration project and the reason why it had not been addressed for many years.

The client had been informed that the building could not be cleaned due to the level of staining. They had been advised that this block would need an entire re-paint. When Spectrum came to sample a section of the building, they quickly determined that this was a silicone render and could, therefore, be cleaned with the Spectrum P.A.S.T. method.

This building, however, had some of the most challenging access issues Spectrum had ever come across. Each elevation had its difficulties. Reference Image 1 below, we will explain what these were. 

Elevation C – Bears road, a very steep incline meant any machinery used would have to be extremely special, and a partial road closure would be required to gain access to the elevation. 

Elevation D – Was inside the Brighton and Hove bus station with 29 buses and coaches needing to manoeuvre in and out of the depot all day.

It was no wonder that many other contractors had deemed this an “impossible site” a challenge which Spectrum was prepared to take on.

There were a lot of technical access challenges; However, there were also some political challenges too. The Bus station had rigorous protocols on health and safety, and if anyone were to gain access to the back of this bus station, they would need to undertake the same health and safety training their staff would have. The Bears Inn were not allowing any disruption to their Pub garden especially during some of the busiest months of their year, gaining access to this would remain a challenge for Spectrum too. 

With Spectrum considering all of the above. The method of cleaning would consist of combining two access strategies. 15% of the building would be cleaned via rope access in which an A-Frame portable anchor device would be brought to the site as there was no fixed anchor on the roof for the abseilers to use. The remaining 85% would be cleaned via the Spectrum patented steam cleaning pole. This pole would enable much of the work to be done from the safety of the ground without the use of any expensive and disruptive scaffolding, M.E.P.U. or specialist equipment. This access strategy alone was set to save the client over £28,000! With an access method proposed, the political issues would need to be addressed for these planned works to be approved by all parties. 

To address the political challenges to this site, Spectrum conducted a tri-party meeting, to present a solution to the owners of the surrounding affected sites. Spectrum organised for their team to carry out the required health and safety training for them to gain access to the base of the bus and coach depot. The bus garage had also informed Spectrum that they had some roof and gutter issues. Spectrum carried out a full inspection for the bus garage as a thank-you for their cooperation to the planned works. 

The Bears Inn Pub were impressed by the fact that Spectrum would not need to use scaffolding around their pub to gain access to Ursa Court. As a gesture of goodwill for their collaboration on this project Spectrum had a credit note raised to them for future use which included a full external clean to their façade and windows. 

Once all parties had confirmed they were happy to approve the cleaning works, Spectrum began restoring this building to its former glory. In just over 28 days, Spectrum had applied a biocidal wash, steam cleaned, and future-proofed each elevation with minimal disruption to all parties and the public. In addition to the render restoration, Spectrum had cleaned the stained decking, taken care of the gutters and cleaned all windows and surrounds. A building that had been deemed “impossible” to access and “impossible” to clean had been transformed with no risk to the public or environment. 

These planned works would not have been possible without the patented steam cleaning equipment used by Spectrum. After being challenged on numerous occasions such as this one to come up with access strategies outside of the ordinary Spectrum had designed 3D printed and manufactured a steam cleaning pole which would enable them to get around some of the significant access challenges with render cleaning and restoration. In 2015 this equipment was granted an official patent. This access and cleaning method is the first of its kind for render restoration, and one of the many reason Spectrum are continually approached to help access and restore challenging sites. The client was overjoyed with the result and grateful for not having to resolve the political and access challenges surrounding Ursa Court as this was all taken care of by Spectrum.